The court
- Galvanised steel structure
- 10 or 12 mm tempered glass
- Synthetic turf
- Net and posts
- LED lighting
- Shipping and installation
- Preventive and corrective maintenance
One contract, one point of contact, a price you know in advance.
The complete court kit, financed with nothing to pay at signing. Groundwork is quoted separately and paid at the start.

Two settings, and you have your rent.
Galvanised steel frame, 10 mm tempered glass, 12 mm monofilament turf.
Estimate. Your quote depends on the site and on financing approval.
Four steps. You can have an in-principle answer before the site survey has even started.
Court count, model, city. We come back with a two-line quote: the court rent and the groundwork.
Your last two or three sets of accounts, a recent bank statement, ID for the director. Nothing else.
An answer usually comes back within 48 to 72 hours. Final approval follows the site survey.
The contract is signed, the works are scheduled, and the first payment leaves when the court is commissioned.
Not the question you had?
Tell us how many courts and where. You get a quote back, not a brochure.
Rents start at $750 per court per month on a long-term lease, depending on the model. Site works (slab, excavation, drainage, power, installation) are quoted separately and paid at the start.
Around three months. A week for the site survey, six to seven weeks of groundwork, two to three weeks of installation, then handover. A multi-court project does not take much longer: it is the same mobilisation.
The groundwork. Excavation, slab, drainage, electrical supply, permits. We price them line by line before anyone starts, and you pay when the work is done. Everything else is in the rent: structure, glass, turf, net, lighting, shipping, installation.
Your last two or three sets of accounts, a recent bank statement, and ID for the director. An in-principle answer usually comes back within 48 to 72 hours; final approval follows the site survey.
Yes, and it is the most common case. Each phase has its own contract, so adding two courts in two years does not reopen the first one. Multi-court projects also cost less per court: survey, mobilisation and permits are shared.
No. If your courts are recent and come from a recognised manufacturer, we can buy them and lease them back to you: the cash you spent comes back, and you keep playing on the same courts. We check their condition and who installed them first. For a new club, the paperwork is simpler: your business plan, the lease of the site and any quotes you already have.
One contract, one point of contact, a price you know in advance.
Priced line by line. Paid when the work is done.
See the cost breakdown →Turf care, structural checks, lighting, wear parts. Every court is kept at playing standard throughout the lease period. No service agreement to negotiate on the side, and no line that appears in year three.
One negotiation covers every site on your plan. Adding a court a year later is an amendment, not a new project.
One negotiation, all your sites. Courts are added by simple amendment.
Installations synced to your opening calendar, and run in parallel where the schedule needs it.
Leases, maintenance and renewals: one dedicated contact for the whole fleet.
Manufacturing capacity held for you before your property leases are even signed.
Proof50+ clubs equipped since 2017, including Club Med & Accor.
Hotel groups, open-air hospitality operators and padel clubs. The same offer behind a single court and behind a fleet spread over a dozen sites.














Also equipped Club Med · Accor, and independent clubs across Europe.
Tell us how many courts and where. You get a full quote, with court rent and groundwork shown separately, usually within one business day.